Guidelines
Guidelines for Thoughtful Urban Development
Applicable National Laws &
Building Codes
To protect capital and human lives, every real estate project integrated into our platform must maintain verifiable alignment with the primary statutory laws governing urban land and structural design in Bangladesh.
Bangladesh National Building Code
The ultimate legal safety standard governing engineering calculations, seismic loads, and fire exits.
Land Registration Act 1908
The foundational legal statutory law governing valid property deeds, ownership, and asset transfers.
State Acquisition & Tenancy Act 1950
Regulates official land holdings, state ground revenues, and historic mutation trail records.
Environment Conservation Act 1995
Mandates environmental preservation parameters, waste treatments, and protected site buffer rules.
Real Estate Developer Bill
Defines statutory consumer protections, execution liabilities, and developer compliance rules.
REHAB Code of Conduct 2019
Establishes industry-level developer ethical standards, marketing guidelines, and buyer transparency.
Bangladesh Finance Act
Governs required transaction taxes, government registrations, and mandatory legal stamp values.
The Five Stages of Development Review
Every project hosted on the Nexform platform must progress through a transparent, architect-led lifecycle. This sequence moves a property securely from an unverified plot of land to an officially certified occupancy asset.
Stage -01
Title Validation & Multi-Layer Audit
Before design drafts begin, the project site must undergo a rigorous five-layer title review. This process examines legal records at the Sub-Registry Office, verifies active mutation (Namjari) papers, maps accurate Mouza plots, checks for active litigation, and validates zoning permissions.
Stage -02
Architectural Plan Design Submission
A licensed, board-certified architect leads the creation of comprehensive blueprints. These drawings incorporate passive tropical cooling, natural indoor airflow, emergency fire exits, and strict setback margins. All parameters must directly map to local urban boundaries.
Stage -03
Municipal Authority Permitting
The complete design package, alongside detailed engineering calculations and geotechnical soil logs, is submitted to the regional urban planning authority (such as RAJUK, CDA, or KDA). The project must secure a formal building permit before any on-site groundbreaking occurs.
Stage -04
Supervised Onsite Construction Compliance
Physical structural execution is monitored under strict professional engineering oversight. Regular technical inspections ensure that foundation pouring, rebar concrete mixtures, and spatial boundaries align perfectly with the stamped, approved municipal plans.
Stage -05
Final Inspection & Occupancy Handover
Upon physical completion, the regional city authority inspects the asset to issue an official Occupancy Certificate. Nexform audits the final dimensions to verify that common area square footage does not exceed platform caps before handing over keys.